Kiteshot site record
ExampleProgress summary · Flight 4
Example: 24-unit development, Paarl
- Flown
- 13 Jun
- Compared with
- Flight 3 · 16 May
What changed
- 1Slabs poured on blocks D and E
- 2Block A roofed, block B at three floors, block C started
- 3Stockpile moved from the south-east to the north-east corner
- 4Site road surfaced from the gate to the east end
Measurements
| Measure | This flight |
|---|---|
| Slab area poured | +860 m² |
| Stockpile volume moved | 412 m³ |
| Road surfaced | 148 m |
| Blocks above slab level | 3 of 6 |